WhatsApp Email Quote

Shipping printed graphics from China: FOB, DDP, sea or air

Print is light but bulky, so freight is calculated on volume, not weight — and that single fact changes which shipping method makes sense.

9 minread
Logisticstopic
2026-11-13published
Shipping printed graphics from China: FOB, DDP, sea or air

A 50 m² banner order weighs about 25 kg and occupies about 0.15 m³ when rolled. Sea freight prices it on the 0.15 m³; air freight prices it on whichever is greater, actual or volumetric weight — and volumetric weight for 0.15 m³ is 25 kg, so a light bulky shipment is charged almost as if it were dense cargo. This is the reason two freight quotes for the same order can differ by a factor of three.

The three Incoterms you will actually be offered

TermWe handleYou handleBest when
EXW ShenzhenProduction, packingEverything from our doorYou have a forwarder in China
FOB Shenzhen / YantianProduction, export clearance, loadingOcean freight, insurance, importYou import regularly and have rates
DDP your doorEverything including duty and VATUnloadingFirst order, or no import entity

DDP is convenient and 20–40 % more expensive than FOB for the same goods, because the forwarder carries the duty risk. If you import more than twice a year, FOB with your own broker is almost always cheaper.

Sea, air or courier

Courier (DHL / FedEx): 3–6 days door to door. Sensible up to about 30 kg or 0.2 m³. Above that the volumetric pricing punishes you.

Air freight: 5–8 days plus customs. Sensible for 30–300 kg when the goods are needed for a fixed event date.

Sea LCL: 25–40 days door to door. Sensible above roughly 1 m³, or when the date is not critical. The freight itself is cheap; the destination charges (CFS, documentation, delivery order) often cost more than the ocean leg on small shipments.

As a rule: if the event is inside three weeks, air or courier. If it is inside two weeks, say so at quotation stage — production can be compressed, freight cannot.

Volumetric weight, in one line

Air freight charges on the greater of actual weight and length × width × height (cm) ÷ 6000. A carton 120 × 20 × 20 cm is 48,000 cm³ → 8 kg volumetric, even if it weighs 4 kg. Rolled banners in long thin tubes are efficient; flat-packed rigid boards are not.

How we pack

  • Banners: rolled on a core, wrapped in kraft, inside a hard tube. Eyelets and hems are protected by the roll direction.
  • Roll-ups: in the supplied carry bag, then into a carton with the base wrapped separately.
  • Rigid boards and acrylic: interleaved with foam, edge-protected, crated for LCL. Acrylic is shipped with protective film on both faces.
  • Labels: item number, description, quantity and crate number, matching a packing list sent by email before dispatch.

Documents

Commercial invoice, packing list and, where relevant, a certificate of origin. For textile goods some destinations require a fibre composition statement; for FR media, the test report travels with the shipment. We issue documents in the company name on the order, so make sure the invoicing entity matches your import entity — mismatches are the most common cause of a customs hold.

Duty and tax

Printed graphics are usually classified under HS 4911 (printed matter) or, for media supplied without print, 3921 (plastic film and sheet). Rates vary widely by destination and by material. We do not advise on classification — your broker does — but we will supply the material composition so the classification can be made correctly.

What to put in the enquiry

Destination city and postcode, whether you have an import entity, the date the goods must be on site, and whether the order is one shipment or several. With those four answers a freight option can be quoted in the same reply as the print price, instead of a week later.

Related questions

Yes, to most markets. DDP includes duty and import VAT and is quoted separately from the print price so you can compare it with your own forwarder's rate.

Typically 25–40 days door to door depending on destination and port congestion: 3–5 days production and crating, 18–30 days on the water, then clearance and delivery.

On FOB and CIF terms, the importer. On DDP terms the forwarder collects it within the quoted rate. We supply the invoice, packing list and material composition needed for classification.

Want this applied to your project?
Send the dimensions and the site conditions. We will specify the material, the fixing and the price in one reply.