Hoarding graphics: wind load, fire rating and panel planning
Hoarding is the most weather-exposed print most projects buy. It is also the one where a cheap specification fails visibly and publicly, on a street corner, in front of the client.
Send size, quantity and destination. Itemised quote in 12 working hours.
Request a quote
A hoarding is a large flat surface with an edge, facing weather it cannot avoid. Wind does not push evenly on it — it accelerates around the top edge and the ends, and a corner that lifts will tear a panel off in a way that looks like a manufacturing fault but is a fixing and venting fault.
What actually breaks a hoarding
In order of frequency, from the claims we see:
1. Eyelets tear out at the corners. Not because the eyelets are weak but because the corner takes the highest load and is where the spacing is usually widest.
2. Solid banner on an exposed elevation. A solid PVC panel acts as a sail. Without venting, the load on fixings multiplies, and flutter fatigues the material along the eyelet line within weeks.
3. Frame movement not allowed for. A timber or steel frame expands, contracts and shifts. A banner fixed tight to it with no give will either tear or go slack and drum.
Wind load in practical terms
Full wind-load calculation is a structural engineer's job and depends on site exposure, height and local code. What we can give you is the practical envelope that keeps a printed panel intact in service:
| Exposure | Media | Max single panel | Fixing notes |
|---|---|---|---|
| Sheltered — inner courtyard, between buildings | Solid PVC 440–510 gsm | Up to 50 m² in one piece | Eyelets at 500 mm centres |
| Urban street, buildings opposite | Solid PVC, reinforced hem | Up to 30 m² | Eyelets at 400 mm, extra at corners |
| Open site, road frontage | Mesh 270 gsm, 30 % airflow | No hard limit, plan by frame bay | Bungee or tension strap, not rope |
| Elevated or coastal, no shelter | Mesh 340 gsm or FR mesh | Frame bay by bay | Reinforced hem both edges, engineered fixing |
The panel size limit is not about the printer. A 5 m press will print a 5 m panel in one piece. The limit is how much unvented area a fixing schedule can hold.
Mesh or solid
Mesh is not a cheaper banner. It is a different engineering answer: roughly 30 % of its surface is open, so wind passes through instead of loading the frame. The trade is resolution — at close viewing distance the weave is visible and fine text softens.
The rule we use: if a person will stand within three metres of it and read it, solid. If it is above head height on an exposed elevation and read from the road, mesh. On a long hoarding both often appear — solid at pedestrian level, mesh on the upper band.
Panel planning and seams
A 60 m hoarding is not one print. It is a series of panels, and where the joins fall is a design decision that should be made before artwork, not after.
Three approaches, in order of quality:
Seamless where it matters. Keep the hero image — the logo, the face, the product — inside one panel width. Plan the joins over flat colour, sky or ground.
Butt join with a deliberate line. Two panels meet edge to edge with a 5 mm overlap and a batten behind. Accept the line and design it in as a horizontal rule.
Seam through the middle. Cheapest, and the one that gets complained about. A face split down the centre is a reprint, so we flag it before production rather than after.
Panel height also matters: a 2.4 m drop wastes nothing, but a 2.6 m drop off a 3.2 m roll cuts badly across the rest of the run. Sizes that fit the roll economically are on the shipping page.
Fire rating on site
Most public-realm hoardings need a fire rating, and the requirement is asked for at build-up, not at order. B1 to DIN 4102 and M1 to NF P92-507 are the two that come up most in Europe; the US uses NFPA 701. The certificate has to match the actual media batch in the box.
Our FR media ship with the batch test report in the document wallet. If the inspector asks and the paperwork is missing, the panels come down — which is why the report travels with the goods rather than being emailed on request. More detail on what the standards actually certify.
The fixing detail nobody specifies
Print quotations rarely include how the thing attaches to the frame, and that is where most failures originate. Two details are worth writing into the order:
Reinforced hem. A folded and welded hem doubles the material thickness at the eyelet line. It costs a little and roughly doubles the load a panel survives.
Corner reinforcement. A second eyelet, or a webbing patch, at each corner. Corners fail first because they take load from two directions.
Neither is visible on the finished hoarding. Both are the difference between a panel that lasts the campaign and one that gets reordered in six weeks.
Questions this raises
Runs under 50 m² dispatch in 1–2 working days after proof approval. A 290 m² hoarding with a mixed mesh and solid spec typically runs 5–6 days including finishing. Sea freight to Europe adds 25–40 days, air 5–8.
Yes, to the millimetre, but heights that fit the roll economically cost less. On a 3.2 m roll, drops of 2.0, 2.4, 2.6 or 3.2 m waste least.
No. We print, finish and crate the graphics. Frame supply and installation are handled by the site contractor, and we will happily work to their drawing and fixing schedule.