A hoarding that changes with the sales phase
A UK residential development sold in three phases over eighteen months. The hoarding stayed; the message changed four times.
The brief
One hoarding, four messages. Launch, then "70 % sold", then the second phase release, then a completion notice — spread across eighteen months on a site that stayed live throughout.
The constraint
The naive approach is to reprint the whole hoarding each time. That means four full print runs, four installations, four sets of access equipment, and four chances to damage a panel that was fine.
The structure could not move: the frame, the gantry over the entrance and the fixing points were fixed by the site contractor, and the frames had already been set to a specific panel module.
What we did
We designed the hoarding as a system rather than a single image: a permanent base layer carrying the parts that never change — developer identity, agent details, legal notices, the render — and a set of replaceable overlay panels carrying only the changing message.
Each phase swap replaced the overlay panels and re-used the base. Because the base panels were sized to the frame module, a swap was a two-hour job with no access equipment and no risk to the surrounding print.
We held the base panels in stock across the project, so a damaged panel in month fourteen was replaced from stock rather than reprinted against a new colour batch.
Specification
| Layer | Spec | Changes |
|---|---|---|
| Base panels | 510 gsm, welded hem, eyelets to frame module | Never |
| Overlay panels | 440 gsm, eyelets at 400 mm, sized to frame bay | 4 times |
| Gantry banner | Blockout 610 gsm, double-sided, wind-vented top edge | 2 times |
| Stock held | Base panels retained for replacement | 18 months |
What it cost and how long
Ten working days per phase change including production and air freight. The first phase was longer because it included the colour proof and the frame survey.
Four full reprints would have cost roughly two and a half times what the overlay system did, and each would have carried a colour-match risk against the previous phase.
What we would repeat
Treating a long-running hoarding as a template with variables. It is a design decision, not a print decision, and it is worth raising with the developer before the first artwork is supplied.
Client names are withheld on request — design and brand accounts ship under their own labelling. Figures are as invoiced for the project and include finishing; freight is quoted separately.