Six booth kits, one show, eight days

A Singapore exhibition contractor built six stands for six different clients at one show. Every kit had to arrive labelled, complete and in build order, because the hall gave them thirty-six hours.

6 kitsscope
132 m²printed
8 daysproduction
1 showdeadline
Six booth kits, one show, eight days

The brief

Six shell-scheme stands, six clients, one build window. Each stand needed a backwall, side returns, a counter wrap, a hanging banner and two roll-ups. The contractor's own crew would build all six, so the kits had to be separable and identifiable without opening them.

The constraint

The build schedule was the whole problem. Six stands built in thirty-six hours by one crew means the crew cannot spend twenty minutes working out which box belongs to which client. A single mixed pallet would have cost more in site labour than the print did.

The second constraint was artwork timing. Five of the six client files arrived within four days of each other; the sixth arrived late because the client's brand team was still approving copy.

What we did

We packed per stand, not per material type — the opposite of efficient packing and the right answer for the site. Each kit went into its own carton with the client name, the stand number and the build sequence printed on the outside, plus a contents list inside the lid.

Five kits ran first. The sixth was held as a separate short run when its artwork landed, printed on the same press against the same profiles so it matched the rest in finish even though it ran a week later.

We also printed a fifth spare backwall panel and split the roll-up hardware bags across kits so no single carton exceeded a two-person lift.

Specification

ItemSpecPer kit
Backwall3 x 2.5 m, 440 gsm PVC, pole pocket top and bottom1
Side returns1 x 2.5 m, same file resized2
Counter wrapSelf-adhesive vinyl, laminated1
Hanging bannerBlockout 610 gsm, double-sided1
Roll-up stands850 x 2000 mm, aluminium base, bag2

What it cost and how long

Eight working days for the five consolidated kits, plus a five-day turnaround on the late sixth. Freight to Singapore by air, because the build date was fixed and sea freight would have arrived after the show closed.

What we would repeat

Packing by stand rather than by material. It costs a little more in cartons and a little more in shipping volume, and it saves multiples of that in site labour. Any contractor building more than three stands should ask for it.

Client names are withheld on request — design and brand accounts ship under their own labelling. Figures are as invoiced for the project and include finishing; freight is quoted separately.